Installation Manual
5-2 Power-up and Testing
To connect the system to facility power:
1. Locate the Main Power Cable.
2. Plug the female end of the Power Cable into the Main Power Inlet on the rear of the
dispensing system. See Figure 5-1.
CAUTION! Make sure that the Main Circuit Breaker is in the OFF (0) position before
connecting the dispensing system to the facility power source.
3. After making sure the Main Circuit Breaker is OFF, plug the male end of the Power
Cable into the facility power source.
Item Description
1 Main Circuit Breaker
2 Main Power Inlet
3 Main Power Cable Connector
Figure 5-1 Main Power Inlet
2
3
1