Installation Manual
Power-up and Testing 5-1
5 Power-up and Testing
Overview
Once you have performed installation of the accessories, you are ready to power up and functionally test
the dispensing system. This section covers the following topics:
• Connecting Power and Air Supplies
• Pre-Power-up Checkout
• Powering Up the Dispensing System
• Component-Level Functional Tests
• System-Level Functional Test
Connecting Power and Air Supplies
CAUTION! The following procedures should only be performed by a trained
service technician.
Tools and Materials Needed
• Main Power Cable • Diagonal-cut Pliers
• Facility Air Hose
The Main Power Cable is included in the accessories crate.