Installation Manual

Power-up and Testing 5-1
5 Power-up and Testing
Overview
Once you have performed installation of the accessories, you are ready to power up and functionally test
the dispensing system. This section covers the following topics:
Connecting Power and Air Supplies
Pre-Power-up Checkout
Powering Up the Dispensing System
Component-Level Functional Tests
System-Level Functional Test
Connecting Power and Air Supplies
CAUTION! The following procedures should only be performed by a trained
service technician.
Tools and Materials Needed
Main Power Cable Diagonal-cut Pliers
Facility Air Hose
The Main Power Cable is included in the accessories crate.