Installation Manual
X-1000 Installation Checklist
12 of 13
I. Complete System Checks
Step
#
Done
(9)
Test Performed Main Function(s) Tested
72. Perform Valve Offsets routine. All
73. Perform Camera assisted Valve Offsets. All
74. Perform a regular production run with the
Conveyors using the TS-04 Box.
Repeat 20 times.
All
75. Verify that the carrier does not slam into the
Stop Pins.
Production mode Conveyor
check
76. Check that the carrier reaches the Stop Pin. Production mode Conveyor
check
77. Verify that all Conveyor stations are used. Production mode Conveyor
check
78. Verify that the board does not bind during
transfer
Production mode Conveyor
check
79. Open the hood during execution of the
program:
Make sure that the beacon light goes yellow.
Make sure that the Conveyor does not run
the belt or does not activate any pneumatics.
All pneumatics should stay in exactly the
same state as they were before the opening
of the hood.
Check that the dispenser stops all motion
exactly when the hood is raised and
resumes motion only when the hood is
lowered.
The green light should go back on when the
hood closes.
Tests the Beacon itself.
Tests cabling from interface to
the beacon.
Tests the beacon PLD.
Tests the Conveyor is setup
correctly for a recoverable
interlock