Installation Manual
X-1000 Installation Checklist
11 of 13
H. Dispensing Options
Step
#
Done
(9)
Test Performed Main Function(s) Tested
60.
Needle heaters
Verify proper operation of all needle heaters
and both needle heater channels (needle
heater 1 and 2)
DHC heat control,
Needle heaters
61.
Scale
Ensure that the Scale is leveled by checking
to see that the leveling bubble is within the
circle
Scale installation, assembly
62. Lift the Scale Pedestal from its seat in the
Scale:
Make sure that there is no fluid that has been
spilled around the Scale and that there is no
rubbing of the Pedestal or Cup and the
Sleeve.
Scale installation, assembly
63. Verify that the Scale weighs accurately to
within .5 mg at 1g and 20 g using a 100mg
weight.
Scale accuracy
64.
Needle Sensor Platform
Verify that the needle sensor input is working
properly using a 30-gauge needle.
NS platform, FMNT, PIO
65. Verify that the Tactile Sensor is working
properly.
NS platform, FMNT, PIO
66.
Low Fluid Sensor
Verify that the Low Fluid Sensor works
properly on both Valves using the proper
terminal mode commands.
LFS, Dispenser 555 Board
67.
Vision System
Ensure that the LEDs change from off to full
brightness as the range goes from 0 – 255
respectively for both the blue and red
individually and together.
Dispenser 555 Board, CAN-
FMNT NER control
68. Camera image, cross hairs are clear. Camera adjustment
69. Camera focuses on board and white
substrate on Needle Sensor.
Camera adjustment
70. Re-run vision calibration. Camera calibration
71. Verify that the system can find both model
and corner fiducials
Overall vision check.