Installation Manual

X-1000 Installation Checklist
9 of 13
Step
#
Done
(9)
Test Performed Main Function(s) Tested
48.
Conveyor Sensors
Preheat station sensor toggles to “
1” when a
Customer board/boat is slid under the
sensor.
Dispense station sensor toggles to “1” when
a Customer board/boat is slid under the
sensor.
Post heat station sensor toggles to “
1” when
a Customer board/boat is slid under the
sensor.
FMNT, CAN control, and the
Sensor itself.
49. Verify Board Sensors do not interfere with
HS-RT probe during dispense.
Board sensor clearance.
50.
Conveyor Pneumatics
Verify that vacuum lines are properly tucked
underneath Tooling Plates, and have
adequate service loop. It is important to
check that there is no rubbing or wearing of
the pneumatic or electrical lines.
Tooling cable routing.
51. Verify that no pneumatic or electrical lines
touch the Scale or the Scale Bracket. This is
very important!
Scale mounting.
52. Verify proper lifting and Clamping of a loaded
tray at each station. Flow controls may need
to be adjusted to achieve this.
Adjustment of Conveyor
pneumatic assemblies.
53. Verify enough vacuum is generated at each
piece of Tooling. Also verify that
Impingement System works properly.
Vacuum system, routing.
54. Verify that the machine will properly load a
board.
(Board is correctly Clamped into place,
proper clearance between Tooling and
Conveyor trays, Parts load up without
slamming into the Stop Pins)
Dispense station overall
check, FMNT-CAN interface.
55. Verify that the machine properly unloads a
board.
(Verify the Tooling/Clamp lowers smoothly.
The Conveyor flow constrictors will need to
be adjusted to achieve this result. A smooth
motion is required.)
Dispense station overall