Installation Manual

X-1000 Installation Checklist
7 of 13
Step
#
Done
(9)
Test Performed Main Function(s) Tested
35.
Valve 1 DP-3000 Logic Test
Verify that the DP-3000 resets, Refill, primes
and refills properly from the Valve 1 position.
The Valve state LEDs (no's A0-A3 on
Z-head) LEDs should end up as below.
After reset, refill - A3 m
After prime - A1 m
The Valve LEDs should end up as follows.
After reset, refill: STOPCOCK m
After prime : PRIME m, STOPCOCK m
Valve 1 control circuitry and
555 control
DP-3000 operation, stopcock
pneumatics
36.
Valve 2 DP-3000 Logic test
Verify that the DP-3000 resets, homes,
primes and refills properly from the Valve 2
position.
This includes verifying operation of the LEDs
on the Valve and the state machine LEDs on
the Z-head as above.
Valve 2 control circuitry and
555 control
DP-3000 operation, stopcock
pneumatics
37. From the FMNT->TOOLS->IO TEST->
Select 555_reset bit and verify that Valve
goes through reset routine.