Installation Manual
Service Shutdown
Before performing any servicing or parts replacement, the dispensing system should be shut down
as follows:
1. Wait for the dispensing program to complete.
2. Purge the Dispensing Valve as specified in the applicable Dispensing Valve Installation and
Operation Manual.
3. Press the black
OFF (0) button on the Operator’s Console and verify that all dispensing
system motion stops.
4. Save any changes to dispensing programs, exit FmNT and Windows NT, and turn the
Computer Power Switch to the
OFF (0) position.
! When FmNT is closed, the Main Air Solenoid Valve shuts off and all hazardous air
pressure inside the dispensing system is automatically released.
5. Shut off air pressure by turning the Main Regulator Adjustment Knob counterclockwise.
See
Figure 2-7.
5
2
1
4
3
–
+
Item Description
1 Regulator Adjustment Knob
2 Filter-Regulator
3 Main Air Inlet
4 Facility Air Hose
5 Main Air Pressure Gauge
Figure 2-7 Main Air Pressure Regulator and Gauge
Safety 2-15