Installation Manual

8-114 Troubleshooting
13. Check continuity of SMEMA Upstream Cable, routed between Conveyor Controller and the Rear
Bulkhead of the dispensing system. Pin connections are specified in Table 8-33.
Table 8-33 Upstream Cable Pin Connections
P1 Color P2
1Black 9
2White 3
3 Red 10
4 Green 4
5Brown 1
6Blue 2
7 Orange 11
8Yellow12
9PurpleN/C
Shell Shield 8
14. Is there continuity?
SMEMA Upstream Cable (P/N 06-4645-00) has
failed. See
Parts Replacement section.
Go to Step 15
15. Connect the Power Cable to the facility outlet, switch Main Circuit Breaker to ON (I) position, press
the green
ON (I) button on the Operator’s Console, and enter FmNT.
16. Press Button 3 on the TS-01 Box.
17. In the FmNT I/O SMEMA screen, verify that “Board available from upstream tool” is displaying
ON.
Go to Step 18
External SMEMA Upstream Cable (P/N 06-2142-00) has failed, or Upstream
System has failed. See
Parts Replacement section for the cable.
18. Exit FmNT, shut down Windows NT, press the black OFF (0) button on the Operator’s Console,
switch Main Circuit Breaker to
OFF (0) position, and disconnect Power Cable from the facility outlet.
No
Yes
No
Yes