Installation Manual

8-20 Troubleshooting
8.1.3 System Power Fault Isolation Procedure
The System Power Fault Isolation Procedure consists of the following:
System Power Verification
Cable Verification
Front EMO Button Verification
Rear EMO Button Verification
Vent Switch Faker Verification
Operator’s Console
OFF (0) Button Verification
XY Servo Interface Power Verification
Dispense Head Controller Power Verification
Before troubleshooting a problem, please familiarize yourself with the important information provided in
the Safety section of this manual.
WARNING! A dispensing system in need of troubleshooting may have High Voltage present
in both designated and unsuspected places that can result in injury or death.
Adhere to safety precautions listed in the Safety section of this manual.
WARNING! Disconnect and lockout power to systems connected to the dispensing system
(such as loaders and ovens) before troubleshooting. Failure to do so may result
in serious injury or death.
CAUTION! Troubleshooting should only be performed by an Asymtek Field Service Engineer
or an Asymtek-trained service technician.