Installation Manual

7-2 Theory of Operations
Figure 7-1 Flow Diagram - Basic System Operation
Part Loaded
Fluid is Dispensed
Dispensing Preparations Performed
Flow rate calibration.
Dispensing Valve purges.
Vision System locates fiducials.
Height sense performed.
Dis
p
ensin
g
fluid heated.
Part Arrives at Dispense Station
Stop Pin engages to stop part.
Lift Table rises.
Heater maintains part temperature.
Part Stops at
Pre–dispense
Station for
Heatin
g?
No
Yes
Part Conveyed to
Dispense Station
Part Arrives at
Pre-Dispense Station
Stop Pin engages to stop part.
Lift Table rises.
Heater heats/maintains part
temperature.
Part Leaves Pre-Dispense
Station
Lift Table lowers.
Sto
p
Pin disen
g
a
g
es.
Part Stops at
Post–dispense
Station?
No
Yes
Part Conveyed Out of
Dispensing System
Part Leaves Post-Dispense
Station
Lift Table lowers.
Sto
p
Pin disen
g
a
g
es.
Part Arrives at Post-Dispense
Station
Stop Pin engages to stop part.
Lift Table rises.
Heater maintains part
tem
p
erature.
Part Leaves Dispense
Station
Lift Table lowers.
Stop Pin disengages.
Part Leaves Dispense
Station
Lift Table lowers.
Stop Pin disengages.