Installation Manual
5-50 Power-up and Testing
p. Place another simulated production workpiece at the upstream end of the Conveyor.
q. Press the Number
3 button on the TS-01 to move the second workpiece to the
dispense station.
r. Repeat Steps (k) through (q) until you have completed several workpieces.
4. Verify the following:
a. All Stop Pins, Lift Tables, and Clamp Bars should function properly.
b. The workpiece loads, travels on the Conveyor, and unloads smoothly without skewing
or binding.
c. All applicable Conveyor stations are used.
d. When the Hatch is opened:
> The green Beacon light goes OFF and the yellow Beacon light comes ON.
> All dispensing system motion stops and all pneumatic devices remain in the same
position as they were before the Hatch was opened.
e. When the Hatch is closed, the yellow Beacon light goes OFF, the green Beacon light
comes ON, and all motion and pneumatic action resumes.
f. The Camera image is clear and that crosshairs go to the taught dispense locations.
g. The Dispensing Calibration Module is used at the programmed times.
h. All taught fiducials are being found.