Owner manual
Operation 4-7
4.4.3 Service Shutdown
We recommend that you incorporate the following steps into your service shutdown routine:
1. Perform a Production Shutdown as described in the previous subsection.
2. Turn
OFF (0) the Main Power Circuit Breaker at the rear of the system. Lock out and tag out
the power as specified in 2.10 Lockout of Electrical and Pneumatic Energy.
3. Verify pressure at the main air inlet is 0 psi.
4. Disconnect the facility air supply hose.
WARNING! If the facility air hose does not have a quick-disconnect fitting, turn off the facility
air and depressurize the line before disconnecting. Otherwise, injury to personnel
may occur.
5. Disconnect the main power cable from the machine or the facility outlet as applicable
4.5 Operation of Dispensing System Controls
4.5.1 Positioning the Conveyor and Dispensing Head
When necessary, an operator can use Fluidmove position (jog) controls to adjust conveyor rail width,
reposition the workpiece X-axis location on the conveyor, and reposition the dispensing head in the X, Y,
and Z-axes. These position controls can be operated using the Mouse to click on-screen buttons, or by
pressing key combinations on the Keyboard. Both methods are described below.
NOTE These procedures assume that the dispensing system and computer have been turned on,
and Fluidmove software is running as specified in 4.3 System Startup. Access the position
controls using one of the following:
- Select
Jog from the Main Menu.
- Click the
Jog button in the Production Window, Run Window, Programming
Window, or Tools Window.
- Press [
Ctrl]+[J] on the keyboard.