Owner manual
4-30 Operation
4.8 Running Production
The following procedure assumes that the computer and monitor are on and Fluidmove has been started
as described in 4.3.2 Starting Fluidmove Dispensing Software.
To start a production run:
1. Verify that the Main Air, Valve, and Fluid pressures are set to the desired level.
If not, adjust pressure as described under 4.5.3 Pneumatic Controls.
2. .Verify that all dispensing head accessories are properly connected. See 4.5.4 Connections on
the Dispensing Head.
3. In the Fluidmove Main Window, click on
Run a Program.
This opens the Production Window.
4. In the Production Window, click on the
Setup button and then click on Setup Scripts.
The Run Script Window opens. See Figure 4-17.
5. In the Run Script Window, select
Prompted Setup and when the Prompted Setup dialog box
opens, click on
Run to End.
Figure 4-17 Production Window – Setup Scripts (FmNT)
6. Follow the on-screen prompts and when finished, click on Exit to return to the Production
Window.
If necessary, refer to the Fluidmove User Guide or Online Help for assistance.
NOTE If the program shown in the upper left corner of the Production Window is not the desired
program, proceed with Step 7. Otherwise, skip to Step 9.