Owner manual

ACJ Series Applicator Systems
11
2000 Nordson Corporation
All rights reserved
303 810A
Issued 1/00
Manual 12-46
WARNING: Allow only qualified personnel to perform the
following tasks. Follow the safety instructions in this document
and all other related documentation.
Refer to your Century workcell manual for system setup and operating
procedures.
1.See Figure 4. Turn the pressure controller valve to the OFF position.
2.Fill the ACJ-S syringe or ACJ-ST reservoir:
ACJ-S Applicators:
a.Remove the thumbscrew from the applicator bracket.
b.Remove the applicator from the Z-head.
c.Rotate the applicator bracket to the right to separate the bracket
and syringe from the body. Unless you need to clean the syringe,
there is no need to remove the syringe from the bracket. Do not
damage or bend the needle.
d.Fill the syringe with flux.
e.Install the bracket and syringe over the needle and onto the body.
Turn the bracket to the left to lock it onto the body.
f. Re-install the applicator on the Z-head.
ACJ-ST Applicators:
a.Pull the pressure relief valve ring. The valve is mounted on the
side of the workcell.
b.Remove the reservoir cap by turning it counterclockwise.
c.Fill the reservoir with flux.
d.Replace the cap.
3.Install a nozzle on the applicator if one is not already installed.
4.See Figure 3. Turn on the ACJ-1 controller power switch and set the
desired range and valve opening time.
3. Operation
Startup