Manual

www.nord.com B1092-GB -7-
4. Maintenance
General overhaul
A general overhaul of the motor must be carried out every 5 years.
For this the motor must be dismantled. The following work must be carried out:
All components of the motor must be cleaned
All components of the motor must be examined for damage
All damaged components must be replaced
All roller bearings must be replaced
All seals and shaft sealing rings must be replaced
Measure the insulation resistance
Check the stationary voltage according to EN 60034-1
The general overhaul must be carried out by qualified personnel in a specialist workshop with
appropriate equipment. We strongly recommend that the general overhaul is carried out by
NORD-Service.