User guide

8
4.2 ELECTRICAL INSTALLATION
1. Disconnect the existing cable C02B from the
existing cable C02.
2. Connect cable C02B included in this kit
between the cables as shown in Figure 8.
3. Route the free ends of cable C02B to the
new sensors and connect to the sensor
connectors.
4. Cable tie all cables to existing hoses or
cables.
It is recommended to follow existing
cables or hoses when routing the
cables.
IMPORTANT:
Provide enough slack in all cables to
account for the movement of the main
section, parallel lift and FOLDING boom
movement.
Figure 8: Electrical Installation
* Existing Parts
* New Parts