Instructions / Assembly

4
Note: After the installation of the necessary plumbing,
check valve and rubber hose, follow the glue
manufacturer’s instructions for safety precautions and
curing time. The pump is ready for operation.
The pump should rest on a level, solid base.
•Do not suspend the pump by the discharge hose or
power cord.
•Keep the pump inlet screen clear.
•Do not install pump directly on sand or dirt.
INSTALLATION INSTRUCTIONS
Always use the handle to lift the pump. Never use
the power cord to lift the pump. To avoid skin burns,
unplug the pump and allow time for it to cool after
periods of extended use.
1
2
Before beginning assembly of product, make sure all
parts are present.
Materials Required for Assembly (not included):
Rubber-hose (6-10” with stainless steel clamps),
Check valve, PVC pipe, PVC elbow, Thread Tape,
PVC Purple Primer, and PVC Cement
Estimated Assembly Time (New installation):
30 minutes (or longer if installing new sump pit).
1. Wrap threads of the 1 1/4 in. adapter ( included)
with thread tape, then screw the adapter into pump
outlet hand tight plus 1 turn with a wrench.
Notice: If the discharge pipe you will connect is 1 1/2 in.,
no need to screw the 1 1/4 in. adapter into the pump
outlet, just screw a 1 1/2 in. check valve into the pump
outlet directly.
2. Install a check valve (not included) into the pump
(or adapter if using 1-1/4 in. pipe).
drill a 1/8 in. (3.2mm) hole
at the end of the thread
3. Connect a short length (6-10 in.) of rubber hose to
the check valve.
Notice: For cast iron sump pump WSSPC3 if your
check valve is not equipped with an air bleed hole to
prevent airlocking pump, drill a 1/8 in. (3.2 mm) hole
at the end of the thread.
WARNING: Always use handle to lift pump.
Never usepower cord to lift pump. To avoid skin burns,
unplug and allow time for the pump to cool after periods
of extended use.
PREPARATION