Instructions / Assembly

1 of 2
09/24/2009
THE CREATIVITY CONTINUES…
4013F2
1.
2.
3. Attach tubing to light AB870
and feed through 4013H.
4. Push rubber stopper
down to create a seal.
Open barb will attach
10" tubing from light.
Frog Buddies Fountain, 2 pc.
4013H
Tubing 10" (04-35H)
Rubber Stopper (19-45H)
Pump (24-16H)
6013H
Adapter (24-132H)
4013H
Light Cord AB870
Tee (15-222H)
Tubing 6" (04-34H)
Tubing 4" (04-34H)

Summary of content (2 pages)