User Guide

CCS Technical Documentation
Issue 2 11/02 ¤Nokia Corporation Page 43
Energy Management Calibration
Baseband Tunings
Energy Management Tuning
External power supply needed
EM Calibration is used for calibrating Battery and Charger settings of the phone.
Preparation for EM Calibration:
•- Connect DC Cable SCB-3 between JBV-1 and Vin of Phone for Charger
calibration.
•- Connect 12…15 V from Power Supply to JBV-1.
•- NOTE! Check that connection is F-BUS (doesn't work with M-BUS!).
Select Maintenance => Tuning => Energy Management Calibration
Energy Management values to be calibrated are checked
Select “Read from Phone” to show current values in phone memory and to check
that the communication with phone works
Select “Calibrate” to run selected calibrations