User Guide

NMM-3 Company Confidential
3 - Service Software CCS Technical Documentation
Page 3-18 Copyright 2003 Nokia Corporation Issue 1 (11/2003)
Company Confidential
Energy Management Calibration
Energy management calibration should be carried out after any of the following:
Replacement of UEME
Replacement of ZOCUS (IBAT only)
Replacement of Flash 0 (D450)
Automatic Calibration
It is recommended that Energy Management calibration is done automatically using the
JBV-1 as follows:
Connections
The NMM-3 phone must be connected to JBV-1 (Docking station) with MJF-29 (Docking
station adapter).
Connect CA-5S (DC-DC cable) from JBV-1 into to phone charger connector before pow-
ering up JBV-1.
Power up JBV-1 from external power supply: 11-16 V DC. (Do not take power from FPS-8
in calibration mode).
Phoenix Setup
Start Phoenix
•Select File - Manage connections - FBUS and apply
•Select File - Scan Product
•Select M
aintenance -> Tuning -> Energy Management