User Guide

RH-23 Company confidential
Disassembly and Assembly Instructions CCS Technical Documentation
Page 10 Nokia Corporation. Issue 1 02/2004
Dome Sheet Assembly
Protect the UI Adhesive. Remove the faulty Domesheet by lifting it up carefully
from UI PWB Module.
Take care about LEDs on the UI PWB Module during
removal of the Domesheet.
Clean the pads on the PWB Module with a clean cloth if
necessary. Be carefully not damage the components on
the PWB.
Put the new Domesheet onto the Domesheet Assembly
Jig. Mind the guiding pins.
Remove the protection film. Tweezers can be used for
retaining the Domesheet.