User Guide

CCS Technical Documentation Assembly & Disassembly Instructions
NPM-2NX
Issue 1 07/02 ãNokia Corporation Page 7
8. Insert screws
The estimated torque according to the screw trial for the all six screws is 22 Ncm and
speed of rotation 480 rpm by using Torx+, 1.8x9 Deprag, automatic feeding 708U driver.
Screwing order for pre-production is 50, 51, 52, 53, 54, and 55. Screwing order possibili-
ties for testing purposes is limited to six (3!=3x2x1=6).
9. Insert antenna-cover to NPM-2NX assembly
In step one, push the front end of the antenna cover downwards until it snaps from four
snap joints in it. Be careful not to break them. Step two shows how to click the two
lower and bigger snap joints last.