User Guide

Table Of Contents
NPL-3
CCS Technical Documentation
Page 74 Copyright ãNokia. All rights reserved. Issue 1 3/03
Service Tool Concept For Baseband Tuning Operations
EM calibrations should be carried out in JBV-1 Docking Station equipped with DA-19
Docking Station Adapter.
Note: RF tunings must be carried out in MJS-38 module jig, JBV-1.
Power to JBV-1 should be supplied from an external DC power supply, not FPS-8 prom-
mer.
JBV-1 input voltages:
Maximum +16 VDC
Nominal input for RF tunings is +12 V DC.