User Guide
Table Of Contents
- 4 - Service Tools
- Service Tools
- List of service tools
- JVB-1 Docking Station with DA-16 Docking Station Adapter
- DA-16 Docking Station Adapter
- SA-25 Antenna Coupler
- SF-17 CCS POS Flash Adapter
- MJ-22 Module Repair Jig
- RJ-66 Soldering Jig
- ST-11 PA Rework Stencil
- Rework procedure
- RJ-46 Antenna Switch Rework Jig
- ST-15 / ST-31 Antenna Switch Solder Paste Stencil
- FPS-8 Flash Prommer
- FPS-10 Flash Prommer
- FPS-11 Multiprommer
- ACF-8 Universal Power Supply
- FLC-2 DC Cable
- AXS-4 Service Cable
- XCS-1 Service Cable
- SW Security Device PKD-1
- FLS-4S POS (Point Of Sale) Flash Device (Sales Pack)
- PCS-1 Power Cable
- CA-41 PS
- XRF-1 RF Cable
- DAU-9S MBUS Cable
- XCS-4 Modular Cable
- CA-5S Service Battery Cable
- CA-10DS Bi-directional Parallel Cable
- DAU-9T Service Cable
- Service Tools
- BACK TO MAIN PAGE

RM-94
Nokia Customer Care 4 - Service Tools
20 COMPANY CONFIDENTIAL Issue 1 04/2005
Copyright © 2005 Nokia. All Rights Reserved.
■ Rework procedure
Due to the large mechanical tolerance of the power amplifiers, the following procedure is nec-
essary:
1. Put the power amplifier into the RJ-21 rework jig. The PA should be placed in
the best fit location, this is determined by placing it in the largest location first, if
this is to large reposition the PA in the next size location. This should be carried
out until the best fit location is found.
1. Once the best fit location has been found, leave the PA there and put the stencil
on top of the jig and PA.
2. Put soldering paste on the PA properly.
Table 2:










