User Guide

NSM–5
Service Software Instructions
PAMS Technical Documentation
Page 46
Issue 1 02/2002
Nokia Corporation
message window is shown. If no response is received to power off test
message in a few seconds, the user is informed by special info window,
where user is asked to turn the power on and then press the return key.
Note also that power–off test (if passed) turns power off and power
should be reconnected by using the phones keypad after the successful
test. After the power has been connected to phone, the normal start–up
routines are made and the self–test results are shown in the MCU self–
tests menu (i.e. all other than power–up self–tests are in
Not executed
state after the power–up routines).
Run button (ALT+R):
User can select desired test from list and hit Run button. When
user selects test to be run the text
RUNNING...
is shown in test
state field and test is run. When results are received the test
state field is updated according to the result.
If no response was received in the defined time, a
error mes-
sage box
will be shown and the test state is changed to
No re-
sponse
. Phone is set to local mode if it is not already.
Run A
ll button (ALT+A):
User can run all listed tests. The text
RUNNING...
is shown in
test state field and test is run. When results are received the
test state field is updated according to the result. When state
field is updated application moves to next test and repeats pre-
vious cycle. Phone is set to local mode if it is not already there.
Supported Self Tests
1 MCU ROM Checksum................
2 MCU RAM Interface...............
3 MCU RAM Component...............
4 MCU EEPROM Interface............
5 MCU EEPROM Component............
6 RTC Battery.....................
7 CCONT Interface.................
8 A/D Converter...................
9 SW Reset........................
A Power Off.......................
B Security Data...................
C EEPROM Tune Checksum............
D PPM Checksum....................
E MCU Download DSP................
F DSP Alive.......................
G COBBA Serial.......................
H COBBA Parallel.....................