User Guide

NEM-2 Company confidential
CCS Technical Documentation
Page 74 Copyright Nokia. All rights reserved. Issue 1 07/03
Service Tool Concept For Baseband Tuning Operations
EM calibrations should be carried out in JBV-1 Docking Station equipped with DA-1
Docking Station Adapter
Note: RF tunings must be carried out in MJ-6 module jig, JBV-1
Docking Station Adapter can only be used for RF testing purposes
Power to JBV-1 should be supplied from an external DC power supply, not FPS-8 prom-
mer
JBV-1 input voltages:
Maximum + 16 VDC
Nominal input for RF tunings is +12 V DC.
Note! RF tunings must be carried out in JXS-2 with DA-1 and JBV-1!