User Guide
Nokia Customer Care Baseband Description and Troubleshooting
2118 (RH-77)
Issue 01 04/2005 ©2005 Nokia Corporation Company Confidential Page 7
Figure 3: Measured power-on sequence and timing
Power Up - Power Key
When the power key is pressed, the UEMC enters the power-up sequence. Pressing the
power key causes the PWRONX pin on the UEMC to be grounded. The UEMC PWRONX
signal is not part of the keypad matrix. The power key is only connected to the UEMC.
This means that when pressing the power key an interrupt is generated to the UPP that
starts the MCU. The MCU then reads the UEMC interrupt register and notices that it is a
PWRONX interrupt. The MCU reads the status of the PWRONX signal using the UEMC
control bus (CBUS). If the PWRONX signal stays low for a certain time the MCU accepts
this as a valid power-on state and continues with the SW initialization of the baseband.
If the power key does not indicate a valid power-on situation, the MCU powers off the
baseband.
Power Up - Charger
In order to be able to detect and start charging in cases where the main battery is fully
discharged (empty) and hence UEMC has no supply (NO_SUPPLY or BACKUP mode of
UEMC), charging is controlled by start-up charging circuitry.
Whenever the VBAT level is detected to be below the master reset threshold (V
MSTR-
),
charging is controlled by START_UP charge circuitry. Connecting a charger forces the










