Nokia MetroSite EDGE Base Station Requirements for Installation and Operation DN9913471 Issue 3-0 en © Nokia Corporation Nokia Proprietary and Confidential Draft 1 (44)
Requirements for Installation and Operation The information in this documentation is subject to change without notice and describes only the product defined in the introduction of this documentation. This documentation is intended for the use of Nokia's customers only for the purposes of the agreement under which the documentation is submitted, and no part of it may be reproduced or transmitted in any form or means without the prior written permission of Nokia.
0523 FCC Hereby, Nokia Corporation, declares that this product is in compliance with the essential requirements and other relevant provisions of Directive: 1999/5/EC. The product is marked with the CE marking and Notified Body number according to the Directive 1999/5/EC FCC §15.21 - Information to user - This product is used as an intentional radiated equipment and any changes or modifications on the equipment without any approval by Nokia could void the user's authority to operate the equipment. FCC §15.
Requirements for Installation and Operation 4 (44) © Nokia Corporation Nokia Proprietary and Confidential Draft DN9913471 Issue 3-0 en
Contents Contents 5 List of tables 6 List of figures 7 1 About this document 11 2 2.1 2.1.1 2.1.2 2.1.3 2.2 2.2.1 2.2.2 2.2.3 2.3 2.3.1 2.3.2 2.3.3 2.3.4 2.3.5 2.3.6 2.3.
Requirements for Installation and Operation List of tables 6 (44) Table 1. Permitted climatic conditions for storage Table 2. Climatic conditions for transportation Table 3. Climatic conditions for operation (class 4.1, extended) Table 4. Wind loads and pole strength requirements Table 5. Permitted operating voltage fluctuation Table 6. Connectors, cables and recommended fuses Table 7. MetroSite BTS connectors Table 8.
List of figures Figure 1. Dimensions of the Nokia MetroSite EDGE Base Station cabinet 22 Figure 2. Clearances around Nokia MetroSite EDGE Base Station 23 Figure 3. Mounting of the Nokia MetroSite EDGE Base Station 25 Figure 4. Power consumption of the Nokia MetroSite EDGE Base Station 29 Figure 5. Range of acoustic sound power generated by Nokia MetroSite EDGE Base Station 30 Figure 6. Removing the top of the BTS cover 33 Figure 7.
Requirements for Installation and Operation 8 (44) © Nokia Corporation Nokia Proprietary and Confidential Draft DN9913471 Issue 3-0 en
Summary of changes Version 1-0, 12th November 1999. Version 2-0, 22nd June 2000: • Added GSM to the title and body text • Added CE marking • Added acoustic noise for 5W TRX BTS in Chapters 2.3.5, 3.6.2 and in Figure 5 • Increased cabinet length to 870 mm in Figures 1 and 2 • Added horizontal mounting note in Chapter 3.3 and edited Figure 3 • Corrected ground resistance figure in Chapter 3.5 • Added note on dark colours in Chapter 3.
Requirements for Installation and Operation 10 (44) © Nokia Corporation Nokia Proprietary and Confidential Draft DN9913471 Issue 3-0 en
About this document 1 About this document This document introduces the requirements set by the Nokia MetroSite EDGE Base Station for successful installation and operation.
Requirements for Installation and Operation 12 (44) © Nokia Corporation Nokia Proprietary and Confidential Draft DN9913471 Issue 3-0 en
Environment 2 Environment This chapter defines the classes of environmental conditions and the severities to which the Nokia MetroSite EDGE Base Station can be exposed. The information is organised into the conditions for: storage, transportation, and operation. 2.1 Storage This section defines the environmental conditions to which the Nokia MetroSite EDGE Base Station can be exposed to during storage.
Requirements for Installation and Operation Table 1. Permitted climatic conditions for storage Environmental parameter Value Low air temperature - 25°C - 13°F High air temperature + 55°C + 131°F Low relative humidity 10% High relative humidity 100% Low absolute humidity 0.5 g/m3 High absolute humidity 29 g/m3 Rain intensity none Temperature change rate (average of 5 minutes) 0.5°C/min Low air pressure 0.9°F/min 70 kPa 10.15 psi High air pressure 106 kPa 15.
Environment 2.2 Transportation This section defines the environmental conditions to which the Nokia MetroSite EDGE Base Station can be exposed during transportation. Caution The Nokia MetroSite EDGE Base Station must be transported in its original package to the installation site. Note The Nokia MetroSite EDGE Base Station is delivered to the customer with the ordered plug-in units pre-installed. 2.2.
Requirements for Installation and Operation Table 2.
Environment 2.2.3 Mechanical conditions for transportation In respect to mechanical conditions during transportation, the Nokia MetroSite EDGE Base Station complies with ETS 300 019 1-2:1992 class 2.3. 2.3 Operation This section defines the environmental conditions which are possible during the operation of the Nokia MetroSite EDGE Base Station at locations which are not protected from direct weather influences. Note When surveying the prospective sites, consider the values presented in this section.
Requirements for Installation and Operation Table 3. Climatic conditions for operation (class 4.1, extended) Environmental parameter Low air temperature Class 4.1 value Extended value for Nokia MetroSite EDGE Base Station -33°C -40°C -27°F -40°F +40°C +50°C +104°F +122°F Low relative humidity 15% - High relative humidity 100% - Low absolute humidity 0.26 g/m3 0.03 g/m3 High absolute humidity 25 g/m3 36 g/m3 Rain intensity 6 mm/min - High air temperature 0.24 in.
Environment 2.3.3 Mechanical conditions for operation In respect to mechanical conditions during operation, the Nokia MetroSite EDGE Base Station complies with ETS 300 019-1-4:1992 class 4.1. 2.3.4 Ingress protection The electronic components inside the units of the Nokia MetroSite EDGE Base Station are protected against the ingress of rain, snow and dust to the minimum level of IP55 of European standard EN 60529, and level 3R of UL standard 50. 2.3.
Requirements for Installation and Operation 20 (44) © Nokia Corporation Nokia Proprietary and Confidential Draft DN9913471 Issue 3-0 en
Installation requirements 3 Installation requirements This chapter specifies the preparatory requirements for the installation of the Nokia MetroSite EDGE Base Station. 3.1 Checking the site The cabinet installation phase requires that the site is properly surveyed and prepared, and that all the required external services are correctly installed. The site survey must identify any special requirements for the installation.
Requirements for Installation and Operation 3.2.1 Nokia MetroSite Base Station dimensions and weight Figure 1 presents the external dimensions of the Nokia MetroSite EDGE Base Station. 870 mm (34.25 in) 114 mm (4.49 in) 310 mm (12.20 in) Figure 1. 215 mm (8.46 in) Dimensions of the Nokia MetroSite EDGE Base Station cabinet The Nokia MetroSite EDGE Base Station with four TRXs installed weighs approximately 40 kg (88.4 lb). The mounting rack weighs approximately 2 kg (4.4 lb).
Installation requirements Min 50 (2.0) 260 (10.2) 260 (10.2) 245 (9.65) NOTE: DIMENSIONS mm (inch) Top view 260 (10.2) 235 (9.3) 235 (9.3) 235 (9.3) 100 (3.94) 100 (3.94) 100 (3.94) 300 (11.9) 300 (11.9) 480 (18.9) 1270mm (50 in) 870mm (34,25 in) Front view 300 (11.9) 310 (12.2) Figure 2.
Requirements for Installation and Operation • to remove units from the BTS when it is installed on a wall or pole • to remove and replace the cover when the BTS is installed on a wall or a pole • for cables and for cooling under the BTS Refer to wall mounting instructions in Nokia MetroSite EDGE Base Station: Installation for more information on using the cardboard template. 3.3 Mounting locations and positions The Nokia MetroSite EDGE Base Station can be mounted on a wall or on a pole.
Installation requirements Incline by 2 - 3 A) Vertical mounting º B) Horizontal mounting Figure 3. Mounting of the Nokia MetroSite EDGE Base Station Note If there is a risk that lumps of snow or pieces of ice can fall onto the BTS (from the antenna or microwave radio pole, for example), an effective roof must be mounted to shield the BTS.
Requirements for Installation and Operation 3.4 Requirements for wall and pole installation The installation wall or pole must be inspected by qualified personnel before mounting the BTS. This is to ensure that the mounting is strong enough to bear the weight of the BTS (maximum 40 kg / 88.2 lb) in its operating environment. Pole mounting kit An optional pole mounting kit is required for pole installations. This kit is ordered separately if required. The pole diameter can be between 60 and 300 mm (2.
Installation requirements 3.5 Grounding To protect the Nokia MetroSite EDGE Base Station from damaging over voltages through antenna equipment, communication cables, or power supply lines, grounding cabling must be planned and installed before installation of the base station. To avoid interference, it is recommended that large grounding systems be designed case-specifically. A electrical plug with a ground connection is not sufficient for the Nokia MetroSite EDGE Base Station.
Requirements for Installation and Operation 3.6 Mains power WARNING The power switch on the power supply unit (PSU) of the Nokia MetroSite EDGE Base Station does not disconnect it from the power network (AC or DC), but leaves it in a stand-by mode. The switch has two positions: ON and stand-by. A separate main switch on the site is considered to be the disconnect device for safety and service purposes. Follow the national legislation when working with the power supply.
Installation requirements • BTS configuration • ambient temperature • direction of the temperature change The power consumption is higher when the ambient temperature is decreasing and the heating power of the BTS is increasing. When the ambient temperature rises, the heating power reduces. Consequently, the power consumption of the Nokia MetroSite EDGE Base Station at a given temperature varies according to the direction of temperature change.
Requirements for Installation and Operation 3.6.2 Acoustic sound power The fan unit of the Nokia MetroSite EDGE Base Station generates acoustic noise. The level of acoustic sound power is dependent on the following factors: • ambient temperature • rate of the temperature change • output power The acoustic sound power level is higher when the ambient temperature is changing rapidly. See Figure 5 for the range of acoustic sound power levels at different ambient temperatures.
Installation requirements 3.6.3 Connectors, cables, and fuses for cable protection Note Prefabricated mains power cables can be ordered from Nokia. Note If you use the prefabricated mains power cable supplied by Nokia, make sure that the power distribution box (mains power supply) is located no further than 10 metres from the BTS’s power supply unit. Table 6 presents the requirements for power supply cables and the recommended mains fuses.
Requirements for Installation and Operation Table 6. Connectors, cables and recommended fuses Power supply type Connector type at the end of cable AC supply 230 V IEC 320 (female) Recommended fuse for cable protection Cable Multicore cable 3 x 0.75 to 1.5 mm 2 1 1 (18 /2 to 15 /2 AWG) 10A for 1.5 mm2 (151/2 AWG) 6A for 0.75 mm2 (181/2 AWG) AC supply 110 V IEC 320 (female) with notch Multicore cable 3 x 1.5 DC supply 48 V Anderson Power Pole Multicore cable 3 x 2.
Installation requirements Caution Do not use any paints that contains alkalis, esters, ketones, or aromatic, chlorinated, or fluorinated hydrocarbons. These chemicals may damage the cover and paint containing them can only be used if approved by the manufacturer for painting polycarbonate objects. The selected paint must be UV and weather resistant, and suitable for temperatures ranging from -40°C to +50°C (-40°F to 122°F). For environmental conditions, refer to ETS 300 019-1-4:1992 class 4.1.
Requirements for Installation and Operation 3. Remove any stains and dust from the surface of the cover with an alcoholic or acidic wash, or with water and a mild washing agent. Do not use washing agents that contain alkalis, esters, ketones, or aromatic, chlorinated, or fluorinated hydrocarbons. 4. Rinse with water to remove any residue of cleaning chemicals. 5. Dry the cover parts by blowing ionized air on them to remove electrostatic charges and dust particles. 6.
Installation requirements 8. Spray paint over the outside surface of the cover. Spraying should be done at room temperature with relative air humidity of 50-65%. Note The maximum thickness of the paint should not exceed 100 µm. 9. Dry the parts either in an oven or let the paint dry at room temperature according to the paint manufacturer’s drying instructions. Note The temperature of the drying oven must not exceed 90°C (194°F). 10.
Requirements for Installation and Operation 36 (44) © Nokia Corporation Nokia Proprietary and Confidential Draft DN9913471 Issue 3-0 en
Cabinet interfaces and cables 4 Cabinet interfaces and cables This chapter describes the external interfaces and interconnecting cables (excluding the grounding and power supply cables) for the Nokia MetroSite EDGE Base Station. For information on the pin configurations of the relevant connectors, refer to Nokia MetroSite EDGE Base Station: Product Description. Note Antenna line cables, the LMP cable, Abis cables and Flexbus cables can be ordered from Nokia.
Requirements for Installation and Operation Table 8. Transmission connectors of the Nokia MetroSite EDGE Base Station Transmission unit type Number of connectors FC E1/T1 3 FXC RRI 2 Connector type Cable Two coaxial BT43 connectors (75 Ω) Coaxial for 75 Ω connector one balanced TQ connector (100/120 Ω) twisted pair for 100/120 Ω connector. TNC 50 Ω Coaxial Flexbus RG-223 (max. length 140 m), coaxial Flexbus RG-214 (max. length 300 m). Max.
Cabinet interfaces and cables 7-10 (.28-.39), 2 pcs Extension cables 8-12.5 (.31-.49), 4 pcs Antenna feeders 10-15 (.39-.59), 1 pc Power supply cable 4.5-7 (.18-.28), 14 pcs - Grounding cable, 1 pc - Transmission cables, max 8 pcs - External alarms and controls Figure 8.
Requirements for Installation and Operation 40 (44) © Nokia Corporation Nokia Proprietary and Confidential Draft DN9913471 Issue 3-0 en
Installation equipment 5 Installation equipment This section specifies the equipment that is recommended for the installation of the Nokia MetroSite EDGE Base Station. This equipment is not included in the BTS delivery. Torque driver (0-6 Nm/0-5 ft-lb) with: - T10 Torx bit with min. 60 mm shaft for unit retaining screws (1.5 Nm/1.11 ft-lb) - 4 mm Allen bit with min. 60 mm shaft: A) for BTS fixing screws (5.5 Nm/4.06 ft-lb) B) for fixing cable entry block screws C) for fixing grounding cable (5.5 Nm/4.
Requirements for Installation and Operation Additional equipment includes: • LMP cable for connecting the manager PC to the BTS • antistatic wrist strap • spirit level for checking the horizontal level of the BTS • tape measure • cable ties for securing the cable routing out of the BTS • crimping tool for fitting a crimp terminal to the grounding cable Note A set of tools needed for assembling the cable connectors is available from Nokia.
Index A acoustic noise 19, installation equipment 41 installation space 21 interface connectors 37 30 C M cable diameters 37, 39 cable protection 31 cables antenna feeders 38 extension 38 external alarms and controls grounding 38 power supply 38 transmission 38 types 37 checking the site 21 clearances 22 connector types 37 mains power 28 mounting locations 24 positions 24 requirements for 38 26 O operation climatic conditions 17 international standard for 17 mechanical conditions 19 safety require
Requirements for Installation and Operation V ventilation 24 W weight BTS 22 mounting rack 44 (44) 22 © Nokia Corporation Nokia Proprietary and Confidential Draft DN9913471 Issue 3-0 en