Product Info

Commissioning
64 (78) © Nokia Corporation Draft DN999099
Nokia Proprietary and Confidential Issue 4-0 en
Figure 31. Summary of commissioning settings
Check that the settings are correct and click NEXT to start the actual
commissioning procedure.
5. The Monitoring Hop page displays the status of the hops during and after
commissioning. The ‘Status’ is shown as ‘Ready’ if the commissioning
was successful. If the commissioning fails for some reason, the ‘Status’
field gives a short description of the failure (such as ‘No far end found’).