Product Info
Table Of Contents
- Commissioning
- 1 About this document
- 2 Commissioning software overview
- 3 Preparing for commissioning
- 4 Getting started with BTS Manager
- 5 Commissioning Wizard process
- 6 Traffic Manager
- 7 Line interface and synchronization settings
- 8 Radio Wizard
- 9 Cross-connections
- 10 Commissioning Report
- 11 Troubleshooting and fault reporting
- Appendix A. LMP connector description
Commissioning Wizard process
DN999099 © Nokia Corporation Draft 39 (78)
Issue 4-0 en Nokia Proprietary and Confidential
Figure 13. Example of a major alarm reported in Nokia BTS Manager
14. If the site was newly created at the BSC, it remains in the ‘locked’ state
after commissioning. If the site is locked at the BSC, the TRXs remain in
the ‘Waiting for system information’ state. The TRX objects in the
Supervision - Equipment View window have the ‘Waiting for system
information’ symbol (see Figure 14). You can also check the operational
states of the TRXs by moving the mouse pointer over a TRX in the
Supervision - Equipment View window, clicking the right mouse button
and selecting the TRX PROPERTIES command.
Request a ‘site unlock’, including TRXs, from the BSC or NMS. After the
‘site unlock’, the BCF is reset automatically and all units enter the
‘supervisory’ state (the LEDs are green).