Commissioning
34 (78) © Nokia Corporation Draft DN999099
Nokia Proprietary and Confidential Issue 4-0 en
Caution
In order not to interfere with the operation of other sites, make sure that an RF
load is connected to every TRX in the BTS before you start local TRX tests.
8. If Abis is connected, the BTS Test Reporting wizard page displays the test
results (see Figure 9). Check the results in the ‘Events’ list.
Whether or not Abis is connected, BTS Manager requests HW reports from
the BTS. The ‘Events’ list will display any alarms 10 seconds after the BCF
has entered the ‘Supervisory’ state. The NEXT button becomes enabled at
this point.
Click NEXT to proceed to EAC input settings.
Figure 9. BTS test events
9. On the EAC Input Settings wizard page (Figure 10), select the required
EACs as ‘In Use’ by marking the checkboxes and then test their
functionality in real time.