Product Info
Table Of Contents
- Field Upgrade
- 1 Overview of field upgrade
- 2 Preparing for upgrade
- 3 Replacing the power supply unit
- 4 Replacing the cooling fan
- 5 Replacing or installing new TRX units
- 6 Chaining Nokia MetroSite EDGE BTSs
- 7 Commissioning for upgrade
- 8 Completing the upgrade
Completing the upgrade
DN00187365 © Nokia Corporation Draft 45 (50)
Issue 2-0 en Nokia Proprietary and Confidential
WARNING
8 Completing the upgrade
GROUNDING. Before refitting the cabinet cover, make sure that the
grounding cable has been reconnected to the BTS cabinet.
Fitting the cabinet cover and completing the upgrade
1. Make sure that all the units and cables are correctly installed and
connected.
2. Fit the cable cover (see Figure 13) as follows:
a. Fit the cable cover support onto the hook at the end of the perforated
plastic panel.
b. Align the cable cover into the recesses on the cable cover support
and slide it downwards until it locks into place.