User's Manual

Nokia MetroSite Base Station Commissioning
14 (34) © Nokia Telecommunications Oy Internal Copy NTC DN999099
Confidential Issue 1 en DRAFT 3 Draft
Note
Note
Figure 2. Site configuration file and site name list
If the EAC inputs will not be used, just click Next.
6. Check the EAC inputs if they will be used. If the SCF is available and the
EACs are defined in it, the ‘In Use’ information is read from the SCF;
otherwise you have to mark the required EACs as ‘In Use’.
The state of each EAC will change in real time as you test them, e.g. if you
blow some smoke on the smoke detector. Then, the appropriate state
changes from ‘Open’ to ‘Closed’, or vice versa.
After testing the EACs, mark them ‘Checked’. When you have completed
the testing (or checking), click Next.
The Next button remains disabled until you click a check mark in the Checked
box for all inputs that are ‘In Use’.