User's Manual

Access P oint Hardw are Installation Installation Ov erview
RF Head Installation
The process of installing the RF Head requires that the following procedures be completed
in the order shown:
1. A ttach the P ole Mounting Bracket Assembly to pole
2. Install RF Head (with side mounting brackets attached)
3. Connect Earth Ground cable between RF Head and tower
4. Connect DC power cables from RF Head to B CU
5. Connect Fiber Optic cable from RF Head to B CU
Other Installation Instructions
A fter the B CU and RF Head have been installed perform the following:
1. If required, power on units
2. Clean up site
3. Fill out the installation completion checklist
Installation Kits
The following items are the kits that may have been shipped to the site.
STHX4003 3.5 GHz RF Head
STLN6518 3.5 GHz RF Head Mounting Bracket
SC1666 Base Control Unit (AC)
STLN6518C B CU pole/wall Mount Bracket
GPS Kits
The following items are the Global P ositioning System (GPS) kits that may have been shipped
to the site.
STRG4037 RF GPS Module
CGDSGPSKITF4NM50 RF GPS Head
T472AA T472AF Remote GPS Receiver Kit
SGKN4386 Remote GPS Cable Kit
68P09277A59 -8 4 -3
PRELIMINARY - UNDER DEVELOPMENT MA Y 2007