User's Manual
Access P oint Hardw are Installation Fiber Optic Cabling Installation
Fiber Optic Cabling Installation
■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
■
■
Objective
This section contains the procedure for installing the fiber optic cables.
Cable Description
Cable H as listed in T able 3 -1 is required for installation.
The minimum bend radius for this cable is 90 mm.
Procedure 4 -16 Procedure to Install Fiber Optic Cables
1
Before routing the Fiber Optic cable(s) up the
tower , verify that it is properly color coded.
Red — RF Head 1
Blue — RF Head 2
Y ellow — RF Head 3
Green — RF Head 4
Color coded labels and tie-wraps can be found on the compartment
side of the door of the B CU Customer Interface compartment.
2
Connect the Fiber Optic cables to the bulkhead feedthroughs (FIBER) on
the underside of the Base Control Unit (B CU). T orque connector nut to 38
in-lbs (4.3 N-m).
Connect or disconnect the cable b y turning the coupling nut. Do
not try to connect or disconnect the cable b y turning the cable or
other attaching components.
3
Route the cable(s) up the tower(s), bundle and secure
to tower (if RF Head is not present) or connect to the
68P09277A59 -8 4 -45
PRELIMINARY - UNDER DEVELOPMENT MA Y 2007