User's Manual

Installation checklist Chapter 7: What s Next and Cleanup
Table 7 -2 Checklist
Item
no.
Item Notes
1
Equipment is not damaged.
2
Air flow clearance requirements
are met.
Door opening clearance
requirements are met.
3
If indoor installation; GAP rack
is securely mounted to floor .
If outdoor installation; GAP
cabinet(s) is securely mounted to
floor or concrete slab.
If outdoor installation; GAP
cabinet(s) that are stacked are
securely mounted together .
If outdoor installation; GAP
cabling and conduit between
cabinets meet local code
requirments (for utility power),
and are installed correctly .
Flexible and rigid conduit is not
stressed.
4
B CU and RF Carrier Unit (RFCU)
are RF cabled correctly .
5
B CU and RFCU are DC power
cabled correctly .
6
B CU is ethernet cabled
(if installed).
Fiber optic, power and RF (if
required) cable between RF head
and GAP is installed correctly .
7
RF head is securely mounted to
pole.
RF head is correctly cabled.
8
Band pass filters are cabled to
RFCU correctly (if used).
9
Conduit is sufficiently grounded.
10
Antennas are grounded to tower .
11
The antenna cables are protected
by lightning arrestors (if
applicable).
12
GAP is grounded.
Continued
7 -6 68P09286A73 -1