User's Manual
Table Of Contents
Ground Based Access P oint (GAP) Hardw are Installation Site Cleanup
Site Cleanup
■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
■
■
Tools and storage
Place all hand and power tools in the installation tool kit or other appropriate place. Note any
tools that need replacement, cleaning, or adjustment. K eep any tools unique to the
Motorola
equipment either at the site, or in an appropriate safe place for later use if needed, as specified
by the site manager .
T ools unique to the
Motorola
site equipment can include, but are not limited to:
• K eys
• Special
Motorola
– supplied tools, such as a single -purpose security socket wrench
• Other third -party installation tools unique to the installation of the site equipment
Materials storage
Place any leftover (usable) materials in a location specified by the site manager .
Debris cleanup
Remove any packing material. Ensure that all scrap materials have been removed. Clean/sweep
the floor . Ensure that all chalk line marks have been removed..Appropriately dispose of any
hazardous waste as specified by the site manager .
Environment
Organize any items (manuals, materials, etc.) left on site and place them in a location specified
by the site manager .
Other items unique to the
Motorola
site equipment can include, but are not limited to:
68P09286A73 -1 7 -3
PRELIMINARY - UNDER DEVELOPMENT JUL 2007