User's Manual

Shipping and Handling Chapter 2: Site Prepar ation
The BTS cabinet is shipped with the B CU cage with all cards/modules and internal cabling
installed.
The BBU cabinet is shipped with all batteries and internal cabling installed.
Depending on the ordered configuration, the TRX cage can be in either the BTS cabinet
and / or the BBU cabinet.
The TRX cage, with the installed TRX modules, will have all internal cabling installed.
How Equipment Arrives
Before the equipment arrives, indicate to the transport company an area at the site where the
equipment can be unloaded and, if necessary , unpacked. The equipment should be carefully
delivered to the site, along with all equipment fork lift, dollies and padding required to safely
move the equipment from the unloading area to the cell site. The site should also have outdoor
weather protection and power for temporary lighting and power tools.
Recommended Unpacking Tools
The following tools are recommended to assist in opening the containers housing the equipment:
Tin snips.
Knife, box cutter , or scissors.
2 -10 68P09286A73 -1
PRELIMINARY - UNDER DEVELOPMENT JUL 2007