User's Manual

Gener al Chapter 2: Site Prepar ation
General
All customer sites have unique situations for installation of equipment. Specific site situations
that affect installation need to be identified, and resolved if necessary , prior to the actual
installation of any equipment.
Overview
The following sections provide the procedures and information to verify that the site is ready
for equipment installation. It also provides procedures to ensure the safety of the installation
personnel, protect the equipment from damage, and verify the site layout parameters.
Ev ery effort should be made to pro vide a safe working en vironment for all installation
and service personnel.
Indoor and outdoor sites
Both indoor and outdoor configurations need to include compliance with local, state and country
electrical and mechanical codes (building code). While low voltage for main power is typically
used, proper cabling of the correct specification for power is required. Equipment weight and
weight distribution needs to be considered for stable structural mounting. Adequate space
around the GAP unit is required for proper air flow and maintenance. F or indoor installations,
proper room temperature and clean air flow also needs to be considered. F or outdoor
installations, proper clearance for the cabinet and cabinet doors needs to be considered for
the installation and any subsequent maintenance procedures.
2 -2 68P09286A73 -1
PRELIMINARY - UNDER DEVELOPMENT JUL 2007