User's Manual
Access P oint Hardw are Installation AC P ower Cabling Installation
AC Power Cabling Installation
■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
■
■
Objective
This section contains the procedure for installing the AC power cable.
This equipment uses dangerous v oltages and is capable of causing death. Use extreme
caution when handling and testing this equipment. Earth connection is essential before
connecting the power due to the presence of high earth leakage current.
AC Cable Description
Cable E as listed in T able 3 -1 is required for this installation.
The minimum bend radius for this cable is 90 mm.
Tools Required
The following tools are required to install the AC power cables.
• No . 2 Blade screw driver
AC Power Connection Procedure
F ollow the steps in Procedure 4 -4 to connect a 100/240 V AC (88–300 Vrms) Single Phase AC
power cable to the Base Control Unit (B CU). The AC power cable will be routed through one and
one -half inch conduit to the appropriate access hole on the underside of the B CU .
Continued
68P09277A59 -5 4 -23
Draft OCT 2006