Objective
This section contains the procedures for installing the Customer Defined Input/Output cables.
Cable Descriptions
Cable F as listed in T able 3 -1 is required for installation.
Customer Input and Output Connector Pinouts
This section contains the procedures for installing the Customer Defined Input/Output cables.
The CDI/CDO cables will be routed through one inch conduit to the access hole on the underside
of the B CU .
Figure 4 -17 Customer Dened Input and Output Connectors
Customer Dened Input/Output Cable Installation
F ollow the procedure in Procedure 4 -10 to install the Customer Defined Input/Output Cables
Procedure 4 -10 Procedure to Install the Customer Dened Input/Output Cables
1
If not already open, open the Customer Interface Compartment.
If not already done, remove conduit plug from access hole.
2
Route the Customer Defined Input (CDI) Cable 1–2 through conduit to the
underside of the B CU , through the access hole, and up to the connector
labeled
CUST . INP UT 1–2
3
P erform step 2 for CDI Cable 3–4.
4
Route the Customer Defined Output (CDO) Cable 1–4 through conduit to
the underside of the B CU , through the access hole, and up to the connector
labeled
CUST . OUTP UT 1–4
5
P erform step 4 for CDO Cables 5–8, 9–12, and 13–16.
6
Ensure a good connection.
Close and lock Customer Interface compartment.