User's Manual

Installation Ov erview Chapter 4: Access P oint Hardw are Installation
Installation Overview
Overview
This chapter provides procedures for Base Control Unit (B CU) and RF Head installation and
associated cabling.
All required cables have been installed at the site and routed to the B CU . The following items
are covered in this chapter .
Assemble the B CU mounting hardware
Assemble the RF Head mounting hardware
A ttach signal cables to the B CU and RF Head
A ttach power cables to B CU and RF Head
Complete the installation completion checklist
The site cabling has been installed and routed to the location of the B CU .
Procedure Order
The process of installing the outdoor unit requires that the following procedures be completed
in the order shown:
4 -2 68P09277A59 -5
Draft OCT 2006