Product Info
Table Of Contents
- 13.1_IHET6HG1_install_manual.pdf
- Install_Manual_PRELIMINARY
- R20 1X UBS Macro BTS Hardware Installation
- Copyrights
- Contents
- List of Figures
- List of Table
- About This Manual
- Front Matter
- Chapter 1 - Introduction and Frame Identification
- Abbreviations and Acronyms
- Overview
- Scope of manual
- Prerequisites
- Chapter 1 - Introduction and frame identification
- Chapter 2 – UBS Macro BTS installation procedure
- Chapter 3 - Low-to-Mid Capacity Frame Expansion Procedures
- Chapter 4 - What’s next
- Equipment shipped assembled
- Equipment shipped un-assembled
- Follow the task sequence
- Follow the site plan
- Site cleanliness
- Site manager
- Color coding
- Rack vs. frame
- Required documentation
- Equipment may vary from figures
- Item identification
- UBS Macro BTS frames
- Figure 1-1 UBS Macro BTS low-tier/low-capacity frame (1000 mm ra
- Figure 1-2 Low capacity UBS Macro BTS starter frame (1800 mm rac
- Figure 1-3 UBS Macro BTS mid-capacity frame (1800 mm rack)
- Figure 1-4 High capacity 800 MHz UBS Macro BTS fully expanded fr
- Figure 1-5 High-capacity 1.9 GHz UBS Macro BTS fully expanded fr
- Items to be installed
- UBS Macro BTS frames
- Tools and materials
- Unpacking Instructions
- Chapter 2 - UBS Macro BTS Installation Procedure
R20 1X UBS Macro B T S Hardw are Installation Ov erview
Table 2 -1 Color code – DC power connectors/cables
Color
Represents
ORANGE +27 V DC P ower
BL UE
-48 V DC P ower
Table 2 -2 Color code - RF Equipment and Connectors/Cables
Color
Represents
ORANGE 800 MHz RF equipment
BL UE
1.9 GHz RF equipment
GREEN 2.1 GHz RF equipment
RED
Sector 1
BL UE
Sector 2
YELLOW Sector 3
GREY
RFL (reflected) Main
BROWN
RFL DIV (reflected diversity)
WHITE
F or RF use, it can mean:
• Main
• FWD (forward main)
BLACK F or RF use, it can mean:
• Diversity
• FWD DIV (forward diversity)
68P09283A62 -2 2 -3