Product Info
Table Of Contents
- 13.1_IHET6HG1_install_manual.pdf
- Install_Manual_PRELIMINARY
- R20 1X UBS Macro BTS Hardware Installation
- Copyrights
- Contents
- List of Figures
- List of Table
- About This Manual
- Front Matter
- Chapter 1 - Introduction and Frame Identification
- Abbreviations and Acronyms
- Overview
- Scope of manual
- Prerequisites
- Chapter 1 - Introduction and frame identification
- Chapter 2 – UBS Macro BTS installation procedure
- Chapter 3 - Low-to-Mid Capacity Frame Expansion Procedures
- Chapter 4 - What’s next
- Equipment shipped assembled
- Equipment shipped un-assembled
- Follow the task sequence
- Follow the site plan
- Site cleanliness
- Site manager
- Color coding
- Rack vs. frame
- Required documentation
- Equipment may vary from figures
- Item identification
- UBS Macro BTS frames
- Figure 1-1 UBS Macro BTS low-tier/low-capacity frame (1000 mm ra
- Figure 1-2 Low capacity UBS Macro BTS starter frame (1800 mm rac
- Figure 1-3 UBS Macro BTS mid-capacity frame (1800 mm rack)
- Figure 1-4 High capacity 800 MHz UBS Macro BTS fully expanded fr
- Figure 1-5 High-capacity 1.9 GHz UBS Macro BTS fully expanded fr
- Items to be installed
- UBS Macro BTS frames
- Tools and materials
- Unpacking Instructions
- Chapter 2 - UBS Macro BTS Installation Procedure
Unpacking Instructions Chapter 1: Introduction and Fr ame Identication
Unpacking accessory equipment
UBS Macro BTS accessory equipment is shipped in smaller cartons. The quantity of cartons
is dependent on the BTS site configuration and options. F ollow the steps in Procedure 1 -2 to
unpack the accessory equipment.
Procedure 1 -2 Unpacking accessory equipment
1
Open an accessory equipment carton.
2
Inspect the contents of the carton for damage.
3
V erify that the carton contains all of the equipment stated on the packing list.
4
Repeat this procedure for each carton in the shipment.