Product Info
Table Of Contents
- 13.1_IHET6HG1_install_manual.pdf
- Install_Manual_PRELIMINARY
- R20 1X UBS Macro BTS Hardware Installation
- Copyrights
- Contents
- List of Figures
- List of Table
- About This Manual
- Front Matter
- Chapter 1 - Introduction and Frame Identification
- Abbreviations and Acronyms
- Overview
- Scope of manual
- Prerequisites
- Chapter 1 - Introduction and frame identification
- Chapter 2 – UBS Macro BTS installation procedure
- Chapter 3 - Low-to-Mid Capacity Frame Expansion Procedures
- Chapter 4 - What’s next
- Equipment shipped assembled
- Equipment shipped un-assembled
- Follow the task sequence
- Follow the site plan
- Site cleanliness
- Site manager
- Color coding
- Rack vs. frame
- Required documentation
- Equipment may vary from figures
- Item identification
- UBS Macro BTS frames
- Figure 1-1 UBS Macro BTS low-tier/low-capacity frame (1000 mm ra
- Figure 1-2 Low capacity UBS Macro BTS starter frame (1800 mm rac
- Figure 1-3 UBS Macro BTS mid-capacity frame (1800 mm rack)
- Figure 1-4 High capacity 800 MHz UBS Macro BTS fully expanded fr
- Figure 1-5 High-capacity 1.9 GHz UBS Macro BTS fully expanded fr
- Items to be installed
- UBS Macro BTS frames
- Tools and materials
- Unpacking Instructions
- Chapter 2 - UBS Macro BTS Installation Procedure
R20 1X UBS Macro B T S Hardw are Installation T ools and materials
• 50 W N -type terminators for any unused TX/RX connectors on an IDRF - customer supplied
• Digital Multi -Meter (DMM) Fluke Model 8062A with Y8134 test lead kit or equivalent; used
for precision DC and AC measurements, requiring 4 -1/2 digits.
• One DC connector housing per DC power feed (see T able 2 -8 for quantity of power feeds)
Orange DC connector housing used for +27 V DC application (see T able 2 -14 for
part information).
Blue DC connector housing used for –48 V DC application (see T able 2 -15 for part
information).
• DC connector cable clamps for power cable (see T able 2 -14 or T able 2 -15 for part
information).
• DC connector housing contacts/lugs for power cable (see T able 2 -14 or T able 2 -15 for
part information).
• Crimper tool - Anderson P ower Products part number 1368 - Hydraulic hand tool, maximum
cable size of 300 MCM.
Other tools are required to install the rack to the floor . The method of installing the rack to the
floor , as specified by a Structural Engineer , determines what additional tools are required.
Recommended tools
The following tools are not required, but they may make the installation easier:
• Long screwdriver extension
• Long socket wrench extension
• Mechanical hoist capable of lifting 100 kg, 2 m high
• Banding cutter
68P09283A62 -2 1 -17