Product Info
Table Of Contents
- 13.1_IHET6HG1_install_manual.pdf
- Install_Manual_PRELIMINARY
- R20 1X UBS Macro BTS Hardware Installation
- Copyrights
- Contents
- List of Figures
- List of Table
- About This Manual
- Front Matter
- Chapter 1 - Introduction and Frame Identification
- Abbreviations and Acronyms
- Overview
- Scope of manual
- Prerequisites
- Chapter 1 - Introduction and frame identification
- Chapter 2 – UBS Macro BTS installation procedure
- Chapter 3 - Low-to-Mid Capacity Frame Expansion Procedures
- Chapter 4 - What’s next
- Equipment shipped assembled
- Equipment shipped un-assembled
- Follow the task sequence
- Follow the site plan
- Site cleanliness
- Site manager
- Color coding
- Rack vs. frame
- Required documentation
- Equipment may vary from figures
- Item identification
- UBS Macro BTS frames
- Figure 1-1 UBS Macro BTS low-tier/low-capacity frame (1000 mm ra
- Figure 1-2 Low capacity UBS Macro BTS starter frame (1800 mm rac
- Figure 1-3 UBS Macro BTS mid-capacity frame (1800 mm rack)
- Figure 1-4 High capacity 800 MHz UBS Macro BTS fully expanded fr
- Figure 1-5 High-capacity 1.9 GHz UBS Macro BTS fully expanded fr
- Items to be installed
- UBS Macro BTS frames
- Tools and materials
- Unpacking Instructions
- Chapter 2 - UBS Macro BTS Installation Procedure
R20 1X UBS Macro B T S Hardw are Installation Item identication
Items to be installed
Figure 1 -6 shows the items to be installed.
Figure 1 -6 Items to install
ti-cdma-06008.eps
Low Capacity, +27 VDC
UBS Macro BTS Assembly
Tall Rack
Optional -48V DC or 220 V AC
PSM Shelf (without PSMs)
-48V DC or 220 V AC PSM
(up to two; one required,
two for redundancy)
Optional
RGPS Head
68P09283A62 -2 1 -15
PRELIMINARY A UG 2007