Installation Instructions

R20 1X UBS Macro B T S Hardw are Installation Adding a second/third PSM (–48 V or 220 V AC only)
Adding a second/third PSM (–48 V or 220 V AC only)
A second/third PSM is required when expanding a –48 V DC or 220 V AC UBS Macro
BTS frame from low capacity to mid capacity . T wo PSMs are required for the mid
capacity configuration and the third PSM is for redundancy .
Objective
F or –48 V or 220 V AC only , install the appropriate PSM into slot 2. If applicable, remove the
filler plate that covers slot 3 of the PSM shelf and then install the appropriate PSM into slot 3.
Required items
Parts
Nev er plug a –48 V DC PSM into a 220 V AC PSM shelf .
Nev er plug a 220 V AC PSM into a -–48 V DC PSM shelf .
Up to two of either the following parts are required:
–48 V DC P ower Supply Module (–48 V DC PSM) Motorola model STPN4037
220 V AC P ower Supply Module (220 V AC PSM) Motorola model STPN4036
Tools
The following tools are required:
TORX T25 bit and driver
T orque driver
68P09283A62 -2 3 -19
PRELIMINARY A UG 2007