Installation Instructions
T ask 4: R ack Mounting the Optional PSM Shelf Chapter 2: UBS Macro B T S Installation Procedure
Task 4: Rack Mounting the Optional PSM Shelf
■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ ■
■
■
Objective
The objective of this procedure is to perform task 4:
• F or -48 V DC or 220 V AC UBS only .
Install the PSM shelf to the bottom of the rack. The site configuration/characteristics will
determine if a PSM shelf is to be installed.
• Install the appropriate, -48 V DC or 220 V AC , PSMs into PSM shelf slots 1 and 2. Either up
to two -48 V DC or up to two 220 V AC PSMs can be installed in the shelf . One PSM is
required for the low capacity configuration and the second PSM is for redundancy .
Required items
The following items are required:
• Either a -48 V DC or 220 V AC PSM shelf (whichever is applicable)
• Either up two -48 V DC or 220 V AC PSMs (whichever is applicable)
• Eight (8) M5 x 12 mm screws for mounting the PSM shelf - these screws are included in
the STGN4034 Installation Kit that is packaged with the UBS Macro carrier strip assembly
• T ape measure with millimeter scale, capable measuring up to 1200 mm or with inch scale,
capable measuring up to 48 inches; for measuring screw location heights on rack
• TORX T25 bit and driver
• T orque driver
Procedure
Procedure 2 -3 gives the procedure for performing T ask 4.
Procedure 2 -3 Procedure for T ask 4
1
Locate the bottom RU that is to be used for the installation of the PSM shelf .
2
Using a tape measure, measure mounting screw location heights on each
side of the rack. Measure from the bottom of the RU determined in step 1
(Refer to Figure 2-13 ). Mark the following screw locations:
Continued
2 -32 68P09283A62 -2