Installation Instructions

R20 1X UBS Macro B T S Hardw are Installation T asks 2 -3: Installing R ack & Ground Cable
Required items
The following items are required:
R ack
10 mm socket
T orque driver
Flat blade screwdriver
6 carbon steel grade 8.8 bolts M12 - customer supplied
Other items, specified by the Structural Engineer , that are required to install the rack
Cable DD - customer supplied ground cable, 4 A WG or larger diameter
T wo -hole ground lug and mounting nuts - part of rack hardware kit (CGDSTB54205)
68P09283A62 -2 2 -29
PRELIMINARY A UG 2007