Alarms Testing – continued
FEB 2005 1X SC 4812T Lite BTS Optimization/ATP 3-143
PRELIMINARY
Study the Site Engineering Documents and perform the following tests
only after first verifying that the AMR Cabling Configuration required
to interconnect the BTS Frame with External Alarm Sensors and/or
Relays meet requirements stated in the 1X SC4812T Lite Hardware
Installation manual (68P09262A57) Manual.
Motorola highly recommends that before you start this
procedure, you read and understand it in its entirety.
NOTE
Test Equipment
The following Test Equipment is required to perform these tests:
S LMF
S Alarms Test Box (CGDSCMIS00014) –optional
Abbreviations used in the following figures and tables are
defined as:
S NC = Normally Closed
S NO = Normally Open
S COM or C = Common
S CDO = Customer Defined (Relay) Output
S CDI = Customer Defined (Alarm) Input
NOTE
The preferred method to verify alarms is to follow the
Alarms Test Box Procedure in Table 3-53. If not using an
Alarm Test Box, perform the procedure in Table 3-54.
NOTE
CDI Alarm Input Verification
with Alarms Test Box
Table 3-53 describes how to test the CDI Alarm Input verification using
the Alarm Test Box. Follow the steps as instructed and compare results
with the LMF Display.
It may take a few seconds for alarms to be reported. The
default delay is 5 seconds.
Leave the Alarms Test Box switches in the new position
until the alarms have been reported.
NOTE
3